Production Stabilization Program
ProblemProblem: Frequent sev-2 incidents and low signal-to-noise in alerting.
ResultResult: Daily incident volume dropped from ~20 to ~2 with clearer recovery paths.
Read case studySelected systems work and outcomes.
ProblemProblem: Frequent sev-2 incidents and low signal-to-noise in alerting.
ResultResult: Daily incident volume dropped from ~20 to ~2 with clearer recovery paths.
Read case studyProblemProblem: Inconsistent recognition due to unstable edge runtime behavior.
ResultResult: Detection consistency improved with release guardrails and faster rollback.
Read case studyProblemProblem: Release risk and data drift blocked predictable delivery.
ResultResult: Release confidence improved with stronger validation and environment controls.
Read case study